Illustrative example. Lindsey Vale Concrete Ltd is a fictional company. This scenario shows how a typical construction business would set up and use Verika; it does not describe a real customer or report real results.

Example scenario · Construction

Lindsey Vale Concrete Ltd

Sleaford, Lincolnshire, UK · 14 people · 3 site crews · 2 volumetric mixer trucks

A family-run concrete and groundworks contractor puts its method statements, mix schedule and cold-weather rules into Verika, so crews stop ringing the contracts manager for answers that are already written down.

Before Verika

  • →Every crew rang Gary, the contracts manager, for mix designs, depths and cold-weather limits, often mid-pour.
  • →The rules existed in 16 documents, but nobody on site could find the right page quickly.
  • →New finishers learned the company's way by asking whoever was nearest, so answers varied by crew.

What they gave Verika

  • →Method statements (driveways, trench-fill)
  • →Concrete mix and specification schedule
  • →Cold and hot weather procedure
  • →Volumetric truck checks and calibration
  • →New starter handbook
  • →Customer aftercare and warranty sheet

Construction companies get their region's regulations built in: here, the Building Regulations Approved Documents, CDM 2015 and HSE guidance.

Setting up

  1. Day 1

    Owner signs up, picks England, uploads the 16 company documents. UK Building Regulations and CDM 2015 are already loaded.

  2. Days 2–3

    Gary answers the 8 questions Verika suggests from the documents, by dictating rough notes that Verika tidies without adding anything.

  3. Day 4

    Crews are invited by link; foremen and Gary are set as experts.

  4. Week 2

    Gary reviews the gaps list once a week and answers each new question once.

What the team asks

“Can we pour tomorrow if it's 4 degrees and falling?”

Finisher, on site
No. Below 5 °C and falling is a no-pour. Gary can override only for foundations with an accelerator and full insulation.
Cold and Hot Weather Concreting Procedure, LVC-QA-003

“How deep do we dig on clay with no trees nearby?”

Foreman
1.0 m minimum. Near trees or hedges, stop and ring Gary; the engineer sets the depth.
Method Statement: Trench-Fill Foundations, LVC-MS-005

“Who can sign off a £12,000 quote?”

Office
Gary, copied to Rob. Over £15,000 or out of area is Rob only.
Quoting and Pricing Rules, LVC-COM-002

“How deep do strip foundations need to be?”

Apprentice
At least 0.45 m to avoid frost action, 0.75–1.0 m in shrinkable clays.
Approved Document A, pp. 39–40

When Verika doesn't know

“Do we need a permit to put the mixer on the pavement for a pour?”

Nothing in the company's documents covered it, so Verika said so instead of guessing and logged it. Gary answered once (the client or the council arranges it; check before the day), Rob approved it, and every crew now gets that answer with Gary's name on it.

What changes

  • →Routine questions go to Verika first; Gary gets the ones nobody has answered yet.
  • →Every crew gets the same answer, from the same document.
  • →New starters can look up 'how we do it here' from their first week.

What to measure in your own trial

  • →How many questions a week reach the contracts manager
  • →How many gaps are logged and closed
  • →How quickly new starters stop needing a buddy for routine questions