What are the rules for placing concrete in cold weather on Arizona DOT projects?

Cold weather concrete placement on Arizona DOT projects requires: (1) No placement if ambient temp (shade, away from artificial heat) drops below 40°F or is forecasted to fall below 35°F; resume only when temp exceeds 35°F [6]. (2) Preheat forms, reinforcement, and substrates to ≥40°F (max 10°F above concrete temp) [6]. (3) Use chilled mix water, crushed ice, or cooled aggregate (sprinkling/liquid nitrogen) to control temps [6]. (4) Discontinue operations if temps fall below 40°F; ensure sufficient time to place/protect concrete before 35°F [6]. (5) Precast plants must submit a cold weather plan detailing temp monitoring and curing [1].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Arizona answers