What slump is allowed for structural concrete on Vermont highway projects?

"The mix shall not exhibit segregation at the slump/spread used at placement. If the Engineer suspects there is segregation, the Engineer will require a slump/spread test be performed by the Contractor to visually observe the characteristics of the mix. If, in the opinion of the Engineer, the mix does exhibit segregation, the load will be rejected and subsequent loads shall be tested for a minimum of three loads or until the problem is corrected." [1] "If the Contractor needs a concrete with a slump/spread greater than 8 inches, the Contractor shall propose to the Engineer to use an SCC mix, which shall be submitted to the Engineer for review and acceptance." [1] "The slump/spread (flowability) shall be such that material can completely fill the voids or area as needed without segregation." [1] "The slump/spread minimums and maximums , as determined from trial batches." [3] "The concrete shall be classified and tested as self - consolidating concrete (SCC) if the minimum spread is at least 18 inches." [3]

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Vermont answers