What are the rules for placing concrete in cold weather on Maine DOT projects?

Concrete placement in cold weather on Maine DOT projects requires: (1) No placement against frozen surfaces; remove frost/ice/snow from contact areas [1]. (2) Discontinue mixing/placing if atmospheric temp is below 40°F (shade) and dropping; resume only if temp is ≥35°F (shade) and rising [1]. (3) If authorized for lower temps, heat water to ≤180°F; if aggregate or water >120°F, combine first before adding cement [1]. (4) If temp <25°F, heat aggregate; no frozen materials allowed [1]. (5) Minimum concrete temp as placed per Table 2 (e.g., 60°F for <12″ forms, 40°F for >72″ forms) [1]. (6) No salt/chlorides added [1]. (7) Protect concrete from frost/overheating; remove/replace damaged concrete at contractor’s expense [1].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.

More Maine answers