South Dakota · answered by Verika · verified against sources

What slump is allowed for structural concrete on South Dakota highway projects?

For structural concrete on South Dakota highway projects, slump at placement must be 6–8 inches for free-fall/tremie methods or 7–9 inches for tremie-pumped concrete, with a minimum of 4 inches for 4 hours post-batching [1].

Every answer carries its source — tap a citation to read the official document.

This answer came from Verika — an expert in your pocket. Ask anything, out loud or typed; answers come from your region’s regulations and your team’s own knowledge, cited to the source. If it isn’t in the sources, Verika says so.

Verika provides information with citations to help you find and understand the rules that apply to your work. It is not a substitute for professional engineering or legal judgment. Answer generated 2026-08-28; always confirm against the cited source for your project.